Skip to content
  • Sign in
Construction Management
  • Sign in
  • News
  • Jobs
  • CPD
  • Digital
  • Global
  • Technical
  • More
  • My Account
  • Sign In
  • News
  • Jobs
  • CPD Modules
  • People
  • Digital
  • Global
  • Technical
  • Opinion
  • CIOB Community
  • Legal
  • Partner Content
  • Video
  • Podcasts
  • Powered Access
  • Newsletter
  • Digital Editions
  • Subscriptions
  • Advertise
  • Contact Us
  • X
  • LinkedIn
  • People
  • Global
  • CPD
  • Technical
  • Opinion
  • CIOB Community
  • Legal
  • Video
  • Podcasts
  • Partner Content
  • Powered Access
Newsletter

Sign up to the CM newsletter for free, delivered direct to your inbox.

Subscriptions

The UK’s Most-Read Construction Magazine.

Advertise

Construction Management is the highest circulation construction-based publication serving the UK built environment.

CPD: Compliance with the updated Approved Document L CPD: Compliance with the updated Approved Document L
Time limit: 0

Quiz Summary

0 of 5 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 5 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 5
    1. Question

    The updated regulations require all new homes to produce what percentage fewer operational carbon emissions compared with the Part L 2013 regulations?

    Correct
    Incorrect
  2. Question 2 of 5
    2. Question

    The grace period for compliance with the updated Approved Document L (Part L) ended on…

    Correct
    Incorrect
  3. Question 3 of 5
    3. Question

    What must be used for a home to meet its target fabric energy efficiency rate?

    Correct
    Incorrect
  4. Question 4 of 5
    4. Question

    The as-built BREL report requires what, to show thermal continuity and quality of insulation?

    Correct
    Incorrect
  5. Question 5 of 5
    5. Question

    Housebuilders can meet the emission and primary energy target rates through a combination of what?

    Correct
    Incorrect

Construction jobs

  • EstimatorHays Construction and PropertyNorth West
  • M&E Technical ManagerCaval LimitedLondon
  • Site Manager – HealthcareGM RecruitmentLondon
  • EHS ManagerFuture Engineering Recruitment LtdLondon
  • Setting Out EngineerLinscoYorkshire

Digital Editions

The June 2026 issue of Construction Management magazine is now available to read in digital format.

Client survey – red flags over contractor quality

Image: Dreamstime

Construction clients are not happy about contractor workmanship. Find out more in the 2026 Construction Management and CIOB client survey.

Most popular

Podcasts

podcast featured image
Humanoid construction robots: the key to onsite productivity?
  • Newsletter
  • Subscriptions
  • Advertise with us
  • RSS Feeds
  • Terms & Conditions
  • Contact Us
  • Privacy policy
  • Editorial policy
© Atom 2026
ATOM
CIOB