Construction Management is the highest circulation construction-based publication serving the UK built environment.
News
McLaughlin & Harvey to build £33m waste centre for north London
Cristina Lago Deputy Editor
The facility is aiming for a BREEAM Very Good certification (Credit: McAdam Design)
Barnet Council has appointed McLaughlin & Harvey as the main contractor to build a new 9,000 sq mwaste centre that will serve seven London boroughs.
The £33m Geron Way Waste Transfer Station project is part of the Brent Cross Cricklewood regeneration programme and is being built for the North London Waste Authority.
Works include piled foundations, building a steel frame superstructure and external landscaping.
This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.
Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.
The facility is aiming for a BREEAM Very Good certification and to “significantly minimise” the impact of operations on residents.
Martin Keys, operations director at McLaughlin & Harvey, said: “McLaughlin & Harvey has been building a successful portfolio of significant construction and civil engineering across the London and South East region over recent years.
“Geron Way Waste Transfer Station is another example of the capability and expertise we have in working with our clients to deliver excellent infrastructure that enhances local communities.”
Councillor Alan Schneiderman, Barnet Council cabinet member for environment and climate change and Cricklewood ward member, added: “The new Waste Transfer Station, which will manage waste and recycling for Barnet and six other north London boroughs, features modern and environmentally friendly elements such as living roofs, as well as noise and odour controls.
“These are not only impressive but also vital to us, and the design supports our commitment to achieving the highest sustainability standards while enhancing biodiversity.”
Construction is scheduled to start in late September.
The April 2026 issue of Construction Management magazine is now available to read in digital format.
‘Data rich, insight poor’
How do we address construction’s information overload? CM is running a survey to understand how companies are using their data today, and the biggest bottlenecks they face.
This is not a first step towards a paywall. We need readers to register with us to help sustain creation of quality editorial content on Construction Management. Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings. Thank you.