Digital Construction

How did Everton Stadium save £300k on facade installation?

Image courtesy of Pattern

How did Everton Stadium save £300k on facade installation?

Join the CM webinar on 23 October to find out how Prodtex (with Laing O’Rourke and Lindner Prater) used 4D technology to rehearse every step of the installation before setting foot on site.

In this webinar, Prodtex’s James Wilkinson-Brown and Soufian Saihi will take attendees behind the scenes of the Everton Stadium facade installation project at Bramley-Moore Dock. They’ll show how the project team captured the planned process, evaluated clashes and assembly sequences, optimised lifting strategies, and even engaged operators through VR sessions, all before installation began.

The webinar is free to attend and will be broadcast live. It will be available to watch on demand shortly after live broadcast.

Story for CM Digital? Get in touch via email: [email protected]

Leave a comment

Your email address will not be published. Required fields are marked *

Latest articles in Digital Construction