News

Balfour in retrofit first to slash emissions on £1.5m piling rig

The retrofitted piling rig.

Balfour Beatty has successfully retrofitted a £1.5m piling rig in use on HS2 to bring it in line with the latest EU Stage V emissions requirement.

The six-month pilot of the retrofit solution was carried out by UK company Eminox on a Balfour Beatty-owned Junttan PM20, which was rated at Stage IIIA.

In what was claimed to be the first EU Stage V equivalent retrofit solution in Europe, the machine has been tested by Imperial College London (Centre for Low Emission Construction) and Emissions Analytics and has been validated by the Energy Savings Trust.

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in News