Skip to content
  • Sign in
Construction Management
  • Sign in
  • News
  • Jobs
  • CPD
  • Digital
  • Global
  • Technical
  • More
  • My Account
  • Sign In
  • News
  • Jobs
  • CPD Modules
  • People
  • Digital
  • Global
  • Technical
  • Opinion
  • CIOB Community
  • Legal
  • Partner Content
  • Video
  • Podcasts
  • Powered Access
  • Grenfell Tower Inquiry
  • Newsletter
  • Digital Editions
  • Subscriptions
  • Advertise
  • Contact Us
  • X
  • LinkedIn
  • People
  • Global
  • CPD
  • Technical
  • Opinion
  • CIOB Community
  • Legal
  • Video
  • Podcasts
  • Partner Content
  • Powered Access
  • Grenfell Tower Inquiry
Newsletter

Sign up to the CM newsletter for free, delivered direct to your inbox.

Subscriptions

The UK’s Most-Read Construction Magazine.

Advertise

Construction Management is the highest circulation construction-based publication serving the UK built environment.

CPD: Planned preventative maintenance building surveys CPD: Planned preventative maintenance building surveys
Time limit: 0

Quiz Summary

0 of 5 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 5 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 5
    1. Question

    Which of the following does not serve as a main purpose of PPM building surveys?

    Correct
    Incorrect
  2. Question 2 of 5
    2. Question

    What data structure do many PPM surveys adopt, and is preferred for PFI buildings surveys?

    Correct
    Incorrect
  3. Question 3 of 5
    3. Question

    PPM building surveys are typically conducted…

    Correct
    Incorrect
  4. Question 4 of 5
    4. Question

    Which of the following steps are part of a PPM building survey?

    Correct
    Incorrect
  5. Question 5 of 5
    5. Question

    The component lifecycle…

    Correct
    Incorrect

Construction jobs

  • Estimator
  • Commercial Director
  • M&E Quantity Surveyor
  • Senior Chartered Building Surveyor
  • Head of Projects (Construction)

Digital Editions

The May 2026 issue of Construction Management magazine is now available to read in digital format.

Client survey – red flags over contractor quality

Image: Dreamstime

Construction clients are not happy about contractor workmanship. Find out more in the 2026 Construction Management and CIOB client survey.

Most popular

Podcasts

podcast featured image
Warm Homes Plan: can housing retrofit meet future demands?
  • Newsletter
  • Subscriptions
  • Advertise with us
  • RSS Feeds
  • Terms & Conditions
  • Contact Us
  • Privacy policy
  • Editorial policy
© Atom 2026
ATOM
CIOB