Skip to content
  • Sign in
Construction Management
  • Sign in
  • News
  • Jobs
  • CPD
  • Digital
  • Global
  • Technical
  • More
  • My Account
  • Sign In
  • News
  • Jobs
  • CPD Modules
  • People
  • Digital
  • Global
  • Technical
  • Opinion
  • CIOB Community
  • Academic articles
  • Legal
  • Partner Content
  • Video
  • Podcasts
  • Powered Access
  • Newsletter
  • Digital Editions
  • Subscriptions
  • Advertise
  • Contact Us
  • X
  • LinkedIn
  • People
  • Global
  • CPD
  • Technical
  • Opinion
  • CIOB Community
  • Academic articles
  • Legal
  • Video
  • Podcasts
  • Partner Content
  • Powered Access
Newsletter

Sign up to the CM newsletter for free, delivered direct to your inbox.

Subscriptions

The UK’s Most-Read Construction Magazine.

Advertise

Construction Management is the highest circulation construction-based publication serving the UK built environment.

CPD: Planned preventative maintenance building surveys CPD: Planned preventative maintenance building surveys
Time limit: 0

Quiz Summary

0 of 5 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 5 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 5
    1. Question

    Which of the following does not serve as a main purpose of PPM building surveys?

    Correct
    Incorrect
  2. Question 2 of 5
    2. Question

    What data structure do many PPM surveys adopt, and is preferred for PFI buildings surveys?

    Correct
    Incorrect
  3. Question 3 of 5
    3. Question

    PPM building surveys are typically conducted…

    Correct
    Incorrect
  4. Question 4 of 5
    4. Question

    Which of the following steps are part of a PPM building survey?

    Correct
    Incorrect
  5. Question 5 of 5
    5. Question

    The component lifecycle…

    Correct
    Incorrect

Construction jobs

  • Electrical SupervisorMark MaySouth East
  • Dry LinerMadigan GillEast Midlands
  • Site EnigneerRTL Group LtdSouth East
  • Architectural AssistantPenguin RecruitmentEast of England
  • EstimatorTalk RecruitmentYorkshire

Digital Editions

The November/December 2026 issue of Construction Management magazine is now available to read in digital format.

What are the causes of construction disputes? Take our survey

CM and CIOB have launched a survey to find out whether contractual disputes are increasing in construction – and what is driving them.

Most popular

Podcasts

podcast featured image
Manchesterism: How devolution could bring a skills revolution
  • Newsletter
  • Subscriptions
  • Advertise with us
  • RSS Feeds
  • Terms & Conditions
  • Contact Us
  • Privacy policy
  • Editorial policy
© Atom 2026
ATOM
CIOB