Skip to content
  • Sign in
Construction Management
  • Sign in
  • News
  • Jobs
  • CPD
  • People
  • Digital
  • More
  • News
  • Jobs
  • CPD Modules
  • People
  • Digital
  • Technical
  • Opinion
  • Careers
  • CIOB Community
  • Legal
  • Partner Content
  • Video
  • Podcasts
  • Powered Access
  • Grenfell Tower Inquiry
  • Newsletter
  • Digital Editions
  • Subscriptions
  • Advertise
  • Contact Us
  • X
  • LinkedIn
  • People
  • Digital
  • Technical
  • Opinion
  • CIOB Community
  • Careers
  • Legal
  • Video
  • Podcasts
  • Partner Content
  • Powered Access
  • Grenfell Tower Inquiry
Newsletter

Sign up to the CM newsletter for free, delivered direct to your inbox.

Subscriptions

The UK’s Most-Read Construction Magazine.

Advertise

Construction Management is the highest circulation construction-based publication serving the UK built environment.

CPD: Planned preventative maintenance building surveys CPD: Planned preventative maintenance building surveys
Time limit: 0

Quiz Summary

0 of 5 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 5 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 5
    1. Question

    Which of the following does not serve as a main purpose of PPM building surveys?

    Correct
    Incorrect
  2. Question 2 of 5
    2. Question

    What data structure do many PPM surveys adopt, and is preferred for PFI buildings surveys?

    Correct
    Incorrect
  3. Question 3 of 5
    3. Question

    PPM building surveys are typically conducted…

    Correct
    Incorrect
  4. Question 4 of 5
    4. Question

    Which of the following steps are part of a PPM building survey?

    Correct
    Incorrect
  5. Question 5 of 5
    5. Question

    The component lifecycle…

    Correct
    Incorrect

Construction jobs

  • Electrician – (TEMP) York
  • BIM Manager (MEP)
  • Graduate/Assistant Building Surveyor
  • M&E Quantity Surveyor
  • Senior Quantity Surveyor

Digital Editions

The May 2025 issue of Construction Management magazine is now available to read in digital format.

Powered Access

Image: Access Platform Sales

In pictures | A Hinowa spider lift has become a ‘vital’ part of a historic cathedral’s maintenance programme.

Most popular

Podcasts

podcast featured image
Do we have the skills for a retrofit revolution?
  • Newsletter
  • Subscriptions
  • Advertise with us
  • RSS Feeds
  • Terms & Conditions
  • Contact Us
  • Privacy policy
© Atom 2025
ATOM
CIOB