CPD: Alternatives to diesel generators in construction
Time limit: 0
Quiz Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 5 Questions answered correctly
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
What percentage of PM10 was construction responsible for in London in 2019?
CorrectIncorrect -
Question 2 of 5
2. Question
How many Londoners were estimated to have died prematurely due to air pollution in 2019?
CorrectIncorrect -
Question 3 of 5
3. Question
What was the welfare cabin developed by this programme powered by?
CorrectIncorrect -
Question 4 of 5
4. Question
What percentage of power for the cabin came from the clean air gas generator?
CorrectIncorrect -
Question 5 of 5
5. Question
How did the CAGE compare to a Stage V-compliant diesel engine with respect to emissions?
CorrectIncorrect