Chris Bradford MCIOB, project manager with Clay Construction, talks through the challenge of converting a 19th-century mill into modern homes

Old Town Mill - Chris Bradford MCIOB talks through the challenge of converting a 19th-century mill into modern homes
The new-build terrace and the Old Mill. Image: Clay Construction

Transforming a historic 19th-century mill into modern homes has presented a unique set of construction challenges, requiring careful coordination of complex building works, specialist materials and the careful financial planning and foresight that comes with delivering a £4.7 million development.

Old Town Mill is a historic landmark located above Hebden Bridge in a small semi-rural village. Planning permission was granted to renovate the existing structures into 25 dwellings in total, including four new builds.

The renovation was split into three phases. Construction had to be delivered in stages to support cashflow management, which played a central role in determining how the project progressed. Phase 1, Wool Croft Terrace, involved four new-build properties, and Phase 2, the conversion of a 17m-tall Carding Mill over five stories and comprising 10 dwellings.

The four new homes for Phase 1 required the procurement and coordination of numerous specialist materials, specialist finishes and subcontractors. Alongside the usual construction trades, the project incorporated zinc and thermo-ash fire-rated timber cladding, together with new utility infrastructure to be installed in a semi-rural area with poor access.

Fire-rated timber

With a new modern design using timber cladding and decking onto a roof terrace, finding a compliant fire-rated timber or coating became a priority. The sourced product had to be a thermo-ash that could be pressure-treated with a fire retardant. The project difficulties were compounded by ordering during covid, and the product needed to be procured from Turkey, then sent to be treated, adding pressure to the completion dates.

Old Town Mill - Chris Bradford MCIOB talks through the challenge of converting a 19th-century mill into modern homes
The original building. Image: Clay Construction.

Following the completion of Phase 1, the team moved on to the more complex task of converting Carding Mill, a historic industrial building. The conversion required modern structural interventions such as new steel supports to give structural strength back to the existing fabric of the building. For example, approximately 22,000 concrete blocks had to be manually loaded horizontally inside for construction of party walls and installation of around 170 steel beams and channels to support the new structure, while retaining key features of the original building.

One particular challenge was integrating the modern construction with the existing timber structure. Original beams and roof trusses were retained as visible features, preserving the mill’s industrial character while accommodating its new residential use.

Internal works

The internal works also involved installing approximately 480 timber joists and 700 sheets of 22mm tongue-and-groove chipboard flooring. A new extension incorporated a 5.8m-high ceiling and curtainwall glazing to allow access to the lower ground floor so as not to reduce internal usable space, adding further coordination considerations between the structure, external envelope and internal finishes.

The new homes project incorporated zinc and thermo ash fire-rated timber cladding. Image: Clay Construction

At approximately 17m high, the mill also presented challenges for access, material handling and the installation of structural elements within the existing building without the use of a crane. Once material had been loaded onto the loading bay, all material had to be manually moved into the building. 

The project also faced changing regulatory requirements. Updates to fire regulations meant that the external escape walkway servicing the upper apartments (that was previously constructed) required further assessment. A BR 187 fire separation calculation had to be prepared to demonstrate compliance with the relevant boundary-distance requirements for external fire spread. This added another technical consideration to a project already constrained by the existing building and its layout.

Commercial management remained equally important throughout both phases. Significant increases in labour and material costs since the project began necessitated major cost reviews. As a smaller developer, Clay Developments had to balance construction progress with available cash flow, carefully managing procurement, expenditure and the timing of subsequent work.

The before shot. Image: Sarah Mason Photography

Early engagement

The project involved careful coordination and early engagement with designers and contractors to ensure its success and produce an exceptional product. This became a team effort with the knowledge, skills, and products from architects Gagarin Studio and De Simone Structural Engineers, alongside specialist suppliers including Galaxy Insulation and Dry Lining, JTD Building, Clearview Windows and Chambers Timber Supplies.

Other incredibly responsive site trades included IPH Electrical, Cardwell Heating, J&S Decoration, Eastwood Plastering, PJT Joiners Construction, DS Joinery and JS Horsfield Excavation.

The development demonstrates the breadth of construction management required to deliver a project of this complex nature. From coordinating specialist materials and new infrastructure to managing substantial structural alterations, preserving historic features and responding to regulatory changes, each phase presented different demands within a difficult financial backdrop.

Old Town Mill illustrates how effective construction management and early engagement with the supply chain can bring together technical knowledge, procurement, programme coordination and commercial control to regenerate a historic industrial building and deliver modern homes within a challenging financial and construction environment, from initial design to completion and the proud handover to individual private clients.