Digital Construction

BIM Bytes: New code of practice – Integrating design and asset management

BS8536-1:2015 Briefing for Design and Construction:Code of practice for facilities management was published in July 2015 (and available from August). As well as updating the 2010 standard to take into account operational requirements from the design and construction phase through to “soft landing”, this new standard aligns with the information requirements in PAS1192 and BS1192 and assumes the use of Level 2 BIM.

The British Standard (BS) document states that the general aims in updating are to “complement and strengthen briefing practices and procedures” by promoting the early involvement of the operator or FM team, and extending the commitment of the design and construction team to ensure that operational implications have been properly incorporated.

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM Digital? Get in touch via email: [email protected]

Latest articles in Digital Construction