CIOB Community

Visit Willmott Dixon’s net-zero workspace at Tower Bridge

Tower Bridge Court
Tower Bridge Court will be transformed into net-zero office space

CIOB London Tomorrow’s Leaders will be heading to Thamesside in April to view a net-zero workspace under construction.

Willmott Dixon is transforming Tower Bridge Court, an out-of-date 1990s office building next to Tower Bridge, into one of the UK’s most sustainable offices. The project is for investment firm FORE Partnership.

The existing five-storey building will be stripped back and renewed, preserving the embodied carbon in the frame. Two floors will be added, with a third set back from Tower Bridge to create a terrace and club room.

All tenants will have direct access to outdoor space. The ground floor will incorporate a flexible, 280 sq m multi-use space available for community uses.

TBC.London, as it will be known, will be 100% electric and net zero carbon in operation. It is targeting EPC A and BREEAM Outstanding.

The tour takes place on 17 April at 2pm and the visit will include a discussion with Matt Adams, senior operations manager, Willmott Dixon.

Click for more on the project.

Story for CM? Get in touch via email: [email protected]

Latest articles in CIOB Community