News

Video | O’Rourke and Murphy install 914t HS2 bridge in 45 minutes

https://www.youtube.com/watch?v=q1LYTE9VAxw&feature=youtu.be

A joint venture between Laing O’Rourke and Murphy has installed a 45m, 914-tonne modular bridge for HS2 in just 45 minutes.

The work took place on the A446 in Solihull last weekend (24-25 October).

It is the second of four bridges to be completed on the site of HS2’s new Interchange Station and will carry the A452 and form part of the remodelling of the local road network.

Cleveland Bridge manufactured and supplied 220 tonnes of steel girders for the bridge, while Laing O’Rourke’s offsite manufacturing division Expanded in Nottinghamshire provided 80 precast concrete modular abutment blocks.

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in News