Digital Construction BIM in brief 12.04.22: whole life carbon emissions building regs proposed A round-up of BIM and digital construction stories that you might have missed in the past seven days.
Digital Construction Digital Twin Hub transfers from Centre for Digital Built Britain The Digital Twin Hub will transfer from the Centre for Digital Built Britain to run under the auspices of an industry/catapult partnership at the Connected Places Catapult from 1 April.
Digital Construction AstraZeneca identifies and designs out risks with SafetiBase AstraZeneca identified 40 construction risks on an extension project at its Macclesfield site using 3D Repo’s SafetiBase platform and ultimately designed out working at height risks.
Construction clients are not happy about contractor workmanship. Find out more in the 2026 Construction Management and CIOB client survey.