Digital Construction

Sisk claims European first with robot on Wembley project

John Sisk & Son claims to have become the first contractor in Europe to introduce robotics to construction projects after investing €150,000 (£136,000) in a new type of lifting robot – but has insisted that it won’t replace human workers.

The robot, known as a Material Unit Lift Enhancer (MULE), was developed by the New York-based company Construction Robotics. It is now operational at Sisk’s residential Wembley Park E05 site in London.

A trained construction worker can manually handle the blocks into place using the MULE’s specially designed gripper, also created by Construction Robotics. The lift assist device can handle material weighing up to 61kg, reducing fatigue and injuries among workers.

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM Digital? Get in touch via email: [email protected]

Latest articles in Digital Construction