CPD: How to deliver cleaner power to construction sites
Time limit: 0
Quiz Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 5 Questions answered correctly
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
At what percentage rate does UK construction need to decarbonise by 2030 and 2035?
CorrectIncorrect -
Question 2 of 5
2. Question
When is the use of red diesel expected to be restricted for heavy plant?
CorrectIncorrect -
Question 3 of 5
3. Question
What is the ideal capacity operating range for an onsite generator?
CorrectIncorrect -
Question 4 of 5
4. Question
How do you avoid ‘wet stacking’ when running a high-capacity generator on site?
CorrectIncorrect -
Question 5 of 5
5. Question
What percentage of fuel per kWh is wasted when a generator runs at roughly 10% for an extended period of time?
CorrectIncorrect