CPD: Drainage pumps – construction, climate change and consultancy
Time limit: 0
Quiz Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 5 Questions answered correctly
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
1. Name two pieces of specification you must consider when designing a pump station?
CorrectIncorrect -
Question 2 of 5
2. Question
2. Name the type of pump you would use when developing a property with a basement?
CorrectIncorrect -
Question 3 of 5
3. Question
3. What type of impellor is a macerator?
CorrectIncorrect -
Question 4 of 5
4. Question
4. What should be installed to ensure contaminated waste material from construction sites doesn’t enter the water network?
CorrectIncorrect -
Question 5 of 5
5. Question
Which three processes should be carried out at the end of a building project to ensure a pump is functioning effectively and free from debris?
CorrectIncorrect