Skip to content
  • Sign in
Construction Management
  • Sign in
  • News
  • Jobs
  • CPD
  • People
  • Digital
  • More
  • News
  • Jobs
  • CPD Modules
  • People
  • Digital
  • Technical
  • Opinion
  • Careers
  • CIOB Community
  • Legal
  • Partner Content
  • Video
  • Podcasts
  • Powered Access
  • Grenfell Tower Inquiry
  • Newsletter
  • Digital Editions
  • Subscriptions
  • Advertise
  • Contact Us
  • X
  • LinkedIn
  • People
  • Digital
  • Technical
  • Opinion
  • CIOB Community
  • Careers
  • Legal
  • Video
  • Podcasts
  • Partner Content
  • Powered Access
  • Grenfell Tower Inquiry
Newsletter

Sign up to the CM newsletter for free, delivered direct to your inbox.

Subscriptions

The UK’s Most-Read Construction Magazine.

Advertise

Construction Management is the highest circulation construction-based publication serving the UK built environment.

CPD: Compliance with new dutyholder roles CPD: Compliance with new dutyholder roles
Time limit: 0

Quiz Summary

0 of 5 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 5 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 5
    1. Question

    What legislation introduced the new roles of the principal designer and principal contractor?

    Correct
    Incorrect
  2. Question 2 of 5
    2. Question

    Which party has an absolute obligation to ensure that all building work complies with all relevant requirements?

    Correct
    Incorrect
  3. Question 3 of 5
    3. Question

    How long can an individual be imprisoned for if they fail to comply with the new duty holder regime?

    Correct
    Incorrect
  4. Question 4 of 5
    4. Question

    If a principal contractor feels they are no longer competent to carry out the role, what should they do?

    Correct
    Incorrect
  5. Question 5 of 5
    5. Question

    What happens if a principal designer or principal contractor delegates their role to a third party?

    Correct
    Incorrect

Construction jobs

  • Cpcs 360 Operator [Blue card only
  • Electrical Maintenance engineer
  • Architect
  • M&E Project Manager
  • Flat Roof Technician

Digital Editions

The June 2025 issue of Construction Management magazine is now available to read in digital format.

Powered Access

Image: Access Platform Sales

In pictures | A Hinowa spider lift has become a ‘vital’ part of a historic cathedral’s maintenance programme.

Most popular

Podcasts

podcast featured image
Do we have the skills for a retrofit revolution?
  • Newsletter
  • Subscriptions
  • Advertise with us
  • RSS Feeds
  • Terms & Conditions
  • Contact Us
  • Privacy policy
© Atom 2025
ATOM
CIOB