Digital Construction

Dover Sea Wall project, Kent – Drone is critical tool in wall repair

  • Client: Network Rail
  • Lead Contractor: Costain
  • BIM Tools: Autodesk Recap 360, Trimble Business Center, Agisoft

On Christmas Eve 2015 a 250m section of sea wall and rail track between Dover Priory and Folkestone Central collapsed, putting the railway out of action. Costain was drafted in to replace the retaining wall supporting the embankment for the line, as part of the major South East Multi-Functional Framework rail upgrade and maintenance project.

Sending in surveyors on foot to record the extent of the damage was considered too hazardous, due to the threat of collapse, so a drone was mobilised to survey the entire area.

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM Digital? Get in touch via email: [email protected]

Latest articles in Digital Construction