  1. This is not exactly new in terms of the way projects have been carried out. On both Unilever House and Regent St demolition, the entire internal structure of the building was modelled to enable structural analysis and then programmed to show how it was to be demolished including the temporary works to keep the existing facades in place as these were to be retained. That was 2005!